How reliable automation can offset rising employment costs
As UK manufacturers face increasing employment costs, including a rise in National Insurance contributions from April 2025, businesses must find innovative ways to maintain productivity while managing financial pressures. Instead of expanding their workforce, many companies are turning to automation and technology-driven solutions.
The Challenge - Rising employment costs:
- Employers’ NICs will increase from 13.8% to 15%.
- The earnings threshold for NICs will lower from £9,100 to £5,000, further increasing payroll costs.
- Many firms are reducing headcount or slowing recruitment to counterbalance these costs.
The Solution - Technology from UWT:
UWT offers industry-leading automation solutions that help manufacturers stay productive and cost-efficient amid increasing employment expenses. By integrating smart level control automation into processing systems, businesses can optimise operations, reduce labour dependency, and enhance efficiency.
Level control devices for efficiency:
UWT’s precise and reliable level control devices enable manufacturers to streamline processing without constant human intervention.
These solutions help minimize downtime, improve process reliability, and ensure smooth operation with minimal workforce involvement.




Maximising productivity through connectivity - example:
UWT’s technology integrates seamlessly into modern processing systems, offering robust, user-friendly, and digitally connected solutions.
With real-time monitoring and control, manufacturers can optimise production processes remotely, reducing the need for on-site staff while maintaining operational efficiency.
Cost-effective capital investment:
By implementing UWT’s automation solutions, manufacturers can gain better control over capital expenditures.
Investing in automation not only offsets rising employment costs but also ensures long-term sustainability by enhancing operational efficiency and reducing human error.
Innovation as a growth driver:
Despite financial pressures, manufacturers recognise that continuous innovation is key to long-term success.
UWT remains a trusted partner, supporting businesses with cutting-edge industrial automation technologies that improve process efficiency and future-proof operations.
Looking ahead: Future-proofing manufacturing with UWT:
As manufacturers navigate increasing costs and workforce challenges, UWT’s automation solutions provide the tools needed to maintain productivity and competitiveness.
By leveraging UWT’s proven experience, companies can transition toward a more resilient, tech-driven future while managing financial pressures effectively.


10 key take-aways with UWT:
1. Six year warranty on devices.
2. Standard concepts that can be individually tailored to the application.
3. Special solutions – custom-designed sensors for unique applications.
4. End to end digitisation.
5. Innovative device communication.
6. High level of system availability.
7. High degree of operational security.
8. Complete system configuration.
9. International sales network in over 90 countries around the world.